721 Project Management- International College of Auckland
721 Project Management- International College of Auckland
Assignment Description
Get the best assignment help from MakeMyAssignments.com
Project Management Assignment Help
Please Note:
- This open-book project is a part of the final mark of this paper. You must complete this Lab Practical if you wish to be eligible to pass this paper.
- Ensure that this cover sheet is filled in and attached to your completed Lab Practical.
- Please attempt the project individually, unless it is stated that the assignment is a ‘group assignment’.
- Assignments that have been copied and shared among students will be automatically rejected and disqualified.
- Completed Lab Practical must be hand-written neatly using a blue or black coloured pen or computer-generated. If this is not done, your answer may not be given a mark.
- Please submit project through turnitin, if required by the teacher. Maximum similarity is 30% through turnitin.
- Ensure that this cover sheet is filled in and with the question sheets is attached to your completed assignment work.
- The work contained within the assignment MUST BE YOUR OWN, unless it is stated to be a ‘group assignment’.
- Any work presented that is taken in part or whole from other sources including the Internet MUST BE REFERENCED (APA style/IEEE Style). If it is not referenced, it will be deemed to contain plagiarist material and it will be marked ZERO.
- If you are not satisfied with the marks received for this Assessment, you may appeal for reconsideration by completing the ASSESSMENT APPEAL form (Form 7.3). All Appeals must be submitted through your lecturer WITHIN 3 DAYS from the receipt of your assessment result.
- If for any serious and unpreventable reason you are unable to meet the deadline, you must speak to your lecturer BEFORE the deadline. Late submissions will result in penalties. Refer to your Course Handbook for further information.
- Refer to your student handbook for regulations relating To Resubmission/Reassessment. These must be applied for WITHIN 3 DAYS from the date Assessment Feedback is provided by the lecturer. All applications are to be submitted to your lecturer.
Assessment Instructions for students
- Enter your Student ID number in the space provided above.
- Write/Type your student ID and the question number on each page
- A detailed “Specification Sheet” and “Project Budget” is provided to you in this assessment. You need to carry out project planning, Scheduling, budgeting, resource assignments and risk management by performing analysis as described below.
- You need to work either individually or in pair to produce this project schedule using MS PROJECT software.
- You can use software tools such as MS word, MS Visio and MS project to complete tasks
- you can also complete some questions by using hand drawing and writing
- Two weeks are allocated to you to complete this task.
- Your assessment will be done by the tutor during two weeks and will be based on:
- Participation in the completion of the project
- Understanding of the project
- Completion of the project
- Please go through all questions before attempting the project. It will help you to understand that what performance is required to get maximum marks.
Project CASE STUDY: Chinese OEM Reduces Returns with Improved Product Testing
For original equipment manufacturers (OEMs) supplying the automotive industry, a product can be returned well before the car it’s in reaches the end customer. A key metric suppliers often use in tracking the performance of their products is therefore the number of defective parts per million (ppm) occurring while the car still has 0 kilometers (km) on the odometer.
When Continental Automotive Systems, Tianjin, China, began producing an electronic component known as the silver box for a General Motors subsidiary, the 0 km return goal was less than 100 ppm; the actual return rate, however, was 1,200 ppm.
Company personnel launched a Six Sigma improvement project to make process improvements that would achieve the 100 ppm goal within a year.
About Continental Tianjin
Continental Corporation has 16 plants in China. Its automotive system plant is located in Tianjin, a city on the eastern coast of China not far from the East China Sea. More than 1,200 employees work at the facility and take pride in the plant’s “quality first” philosophy and TS16949, ISO 14001, OHSAS 18001, ESD20:20, and Ford Q1 certifications.
The plant produces electronic systems for automobiles such as vehicle body control modules, engine control systems, transmission control modules, and multimedia infotainment systems. In addition to supplying Chinese vehicle manufacturers, Continental Tianjin produces components for car makers all over the world, with Chrysler, Ford, General Motors, and Volkswagen among its customers.
First launched in May 2010, the silver box is supplied to GM Holden, located in Melbourne, Australia. It includes a CD player, USB jack, GPS, and hands-free Bluetooth feature. Each unit has more than 2,200 components, which introduces a lot of room for error. “The silver box is a challenging product, but we think it’s a good opportunity for growing our output,” said Li Xiang, quality engineer.
Beginning With the End in Mind
As part of strategic planning and operations reviews, Continental Tianjin selects improvement projects using voice of the customer and voice of the business information. Potential projects are categorized either as lean, quick-win efforts, or as longer-term, Six Sigma undertakings.
During the initial months of production of the silver box, customers complained about defects and reported that its quality was not stable. In fact, the silver box customer return rate was 1,260 ppm. An improvement effort named the GM Holden 0 km Return Reduction Project was proposed to lower the return rate and restore customer confidence.
Continental Tianjin projects are ranked according to how well they meet various criteria, including cost and process impacts, customer advantages, employee motivation, and whether the project benefits the greater community. For each criterion, a project receives scores for importance and impact. The scores must meet a specified total to qualify as a continuous improvement project, and projects that score higher receive higher priority.
The GM Holden 0 km Return Reduction Project was approved as a Six Sigma define-measure-analyze-improve-control (DMAIC) project based on its predicted high impact on organizational strategies around cost and customer satisfaction, and its moderate impact on strategies around processes and employees. Figure 1 details the expected improvements. Cost savings would occur from reducing scrap and additional shipping, and customer satisfaction was expected to increase as defects decreased. Additionally, the improvements would increase process capability and give employees the opportunity to gain experience using problem-solving skills and statistical tools.
Figure 1—Degree of impact on organizational strategies
Define Phase
A team was assembled in October 2010, and by November 1 a team charter had been created, with the primary goals defined as reducing 0 km returns to 100 ppm by the end of June 2011. Team leader and Green Belt Zhang Ji-Jun describe the project team as “the Great Wall to protect Continental’s customers.” Core team members, selected based on project requirements and the knowledge and skills of individual candidates, included:
- Cao Zhen-Qi, champion
- Chat Miao, test engineer
- Jian Dong Shi, Black Belt
- Li Xiang, quality engineer
- Yan Yun, test engineer
- Gx Wang, test engineer
A suppliers, inputs, process, outputs, customers (SIPOC) diagram helped the team identify the potential impact of the project on stakeholders. Internal stakeholders included Continental Tianjin quality assurance; process, test, and product engineers; supplier quality management; and Six Sigma belts. External stakeholders included project management, suppliers, customers, and end users. Those that would be affected most were quality assurance, test engineers, product engineers, and customers.
Measure Phase
To better understand silver box defects, the team used a trend chart to analyze process performance over time and identify strengths and weaknesses. According to Ji-Jun, Continental Tianjin’s return tracking system made it easy to obtain quality data for the trend chart. As Figure 2 shows, the return rate was stable at 1,260 ppm from May to November 2010. After verifying the measurement system by conducting a gage repeatability and reproducibility (GR&R) study, the team proceeded to investigate the types of defects that were occurring. They summarized and categorized different return failure modes, and Pareto analysis showed that the top three issues reported by customers were navigation failure, faulty screen display, and electronic data interchange (EDI) screen problems (see Figure 3).
Figure 2—Trend chart showing process performance before improvements
Figure 3—Pareto chart identifying top categories of defects
Analyses Phase
All returned products that caused 0 km failures were verified as faulty by Continental Tianjin; each had a functional problem that surfaced in application but was not detected prior to shipment. “For example,” said Zhen-Qi, champion, “investigation revealed that the navigation failure was caused by a printed circuit board assembly (PCBA) process issue, but it wasn’t detectable in the testing process.” Similarly, the screen display and EDI issues were tracked to the PCBA process but had no testing coverage.
The team performed a test coverage analysis to study the detectability of all 16,213 failure modes and discovered that 191 modes with high risk priority numbers were not covered in testing before shipment.
A fishbone diagram (see Figure 4) helped point to two main causes for the lack of testing coverage for the failure modes: inadequate test specifications and testing designs that did not address all specification requirements.
Stakeholders from test engineering, quality assurance, and the design center helped conduct the technical reviews and experimentation required to validate the two primary root causes:
Some items were missed in the tester design—A
Compliance matrix review showed that 19 items were not included in the tester design. Adding these items would help improve testing coverage for a total of 134 failure modes and reduce the 0 km return rate by an estimated 812 ppm.
Figure 4—Fishbone diagram isolating causes for lack of testing coverage for 191 failure modes
Some items were not considered in specifications—Review of design failure modes and effects analysis showed that many of the failure modes actually had been covered, but they were not defined in product test specifications. Adding these items to the specifications would result in coverage of 57 failure modes and reduce the 0 km return rate by about 400 ppm.
Improve Phase
Identifying solutions
A combination of technical innovation tools including test coverage analysis, fault insertion, and a test methods selection matrix, along with Six Sigma process improvement and statistical tools, helped the team develop and validate solutions.
First, process mapping showed that the 191 failure modes without coverage should actually be covered by three test stations in the production line—the in-circuit test (ICT) station, the general hardware (GHW) test station, and the general function test (GFT) station. Next, the team categorized the failure modes in detail, finding the top three to be an integrated circuit functional problem, a capacitor open circuit, and an electrical short between adjacent integrated circuit pins.
Before creating a plan for improving test coverage, the team agreed upon four criteria for evaluating potential solutions:
- Ease of implementation
- Timeliness of implementation
- Cost
- Ease of reversibility/recovery of original status
For each of the three top failure modes, solutions were assessed according to these criteria using a selection matrix. Figure 5 shows how the matrix for the integrated circuit functional failure supports the solution of adding test items to the GHW testing station.
Testing methods selection matrix
Failure mode: Integrated circuit (IC) functional failure
Figure 5—one of the solution selection matrices the team created
The team’s final solutions involved adding a total of 17 new tests for the three existing test stations: seven tests would be added for ICT, five would be added for GHW, and five for GFT. Additionally, one new testing station, general quality assurance (GQA), would be added to the process. The design center confirmed the data analysis supporting the new tests, and test software was upgraded accordingly. All new test items were further validated by fault insertion, capability studies, GR&R studies, and a two-sample T-test showed that adding the new test items would not have a significant impact on the original test items.
Implementing solutions
To implement the new testing solutions, design, test, and product staff would focus on technical improvements, and the factory focus manager and quality department would be responsible for change control. The team was careful to invest enough effort into optimizing the build plan, dedicating 90 minutes for engineering experiments each day. A Gantt chart also helped the team plan the step-by-step implementation of the solution from December 2010 through June 2011.
The most serious resistance to the improvements was expected to come from the production department. “Personnel were concerned because we needed to shut down normal manufacturing and perform an experiment to evaluate how well the changes associated with our solution would work,” said Black Belt Dong Shi. “We also needed to stop the testers in the normal production line, which would impact on-time delivery.” Careful communication with production staff at all stages helped secure and maintain their cooperation.
Other concerns stemmed from the limited knowledge that some stakeholders had of the product testing process, the geographical distance of the design center from the testing stations, the time required to debug the testing equipment and verify the test code, and the lack of a full-time Black Belt to lead the implementation. Key actions for overcoming resistance and ensuring cooperation included providing product training for nontechnical staff; holding conference calls and online meetings, as well as coordinating sufficient staff travel during the implementation period; holding weekly project meetings to keep all stakeholders informed; and debugging the test code during trial runs in the daily 90-minute trials.
Figure 6 show that upon implementing the new test items and test station, Continental achieved test coverage of 179 items and a defect reduction of 1,260 ppm.
Figure 6—Results from implementing new test items
To sustain these results, the team followed existing control procedures at Continental, such as having the change approved in the electronic process change authorization (ePCA) system, a tool to control any change in the test station or assembly process. Other control measures included a process validation build and using the production part approval process to secure GM Holden’s approval.
Additionally, Continental uses statistical process control in its test systems to detect and eliminate special causes of process variation. For the new test items added by this project, control limits were calculated, and alarms are triggered for failure counts of three or greater. The existing return tracking system, process failure modes and effects analysis documentation, and process control plan were also updated to cover the added failure modes for the new test items and station.
Continuous Improvement from Beginning to End
The GM Holden 0 km Return Reduction Project, which ended in June 2011, ultimately exceed its goals, reducing silver box 0 km returns to fewer than 50 ppm, and achieving cost savings of US$130,000 per year (see Figure 7).
Figure 7—Tangible benefits of the improvement project
Team members said one intangible benefit was positive feedback from GM Holden that might set the stage for additional business. As another benefit, Continental reduced industrial waste that would have been generated from scrapped products.
The project also serves as a lesson learned that will help Continental Tianjin implement process improvements in other areas and for other products. Results have been shared in weekly project reviews, staff meetings, monthly operation reviews, and updates in quarterly Continental Tianjin business system reports. The effort was also publicized in a continuous improvement project showcase.
External recognition came when the team qualified as a finalist in the ASQ International Team Excellence Award (ITEA) Process. The team was invited to present its project at the 2012 World Conference on Quality and Improvement, held in Anaheim, California.
Champion Zhen-Qi concluded, “Total customer satisfaction is our goal, and this project helped us achieve it. We began with the end in mind, and practiced continuous improvement from beginning to end.”
After reading the above project case study, you need to work as project manager and needs to answer the questions asked below
Project Manager Name:
Estimate completion duration:
Question 1: LO4 (A) [Marks 5]
As a project manager of ‘GM Holden 0 km Return Reduction’ project, develop an activity sheet by using the following table:
(Note: At least 10 activities should be identified, planned, scheduled and monitored)
Helping note: Ms Word or Hand written methods can be used to develop activity sheet)
Answer
Activity # | Description | Duration | Start Date | Finish Date | Resource | Cost | Predecessor |
Question 2: LO4 (A) [Marks 5]
As a project manager of ‘GM Holden 0 km Return Reduction’ project, develop a Work break down structure (WBS) for project scheduling from activity sheet by using bottom up approach.
(Note: Ms Word can be used to develop work break down structure
Develop WBS on the basis of roles and responsibilities of departments involved)
Question 3: LO4 (A) [Marks 15]
As a project manager of ‘GM Holden 0 km Return Reduction’ project, develop Gantt chart for the project
(Note: Use MS project to develop Gantt chart)
Question 4: LO4 (B) [Marks 5]
As a project manager of ‘GM Holden 0 km Return Reduction’ project, develop Network diagram by using Activity Sheet, WBS and Gantt chart, as developed in Question 2 and 3.
(Note: Each component of network diagram should show name of the activity, number, Duration and predecessor.
You can use MS Project to develop Newark diagram)
Question 5: LO4(C) [Marks 10]
As a project manager of ‘GM Holden 0 km Return Reduction’ project, , run Critical Path Method (CPM) analysis tool on network diagram(of Q4) to find
- Each activity duration (D), earliest start (ED), earliest finish (EF), latest start (LS), latest finish (LF) and slack time (S).
(Please use template below) [Marks 5]
Answer
Activity 1:
D=
ES=
EF=
LS=
LF=
S=
Activity 2:
.
.
.
.
.
.
(Do it for at least 10 activities)
- As a project manager of ‘GM Holden 0 km Return Reduction’ project, determine Critical path of the project [Marks 5]
Answer
Question 6:LO6 (A) [Marks 30]
- As a project manager of ‘GM Holden 0 km Return Reduction’ project, iidentify potential risks that may occur in this project. [Marks 10]
(At least five risks need to be identified)
Answer
Ref: | Description of risk | Source
(How can the risk occur) |
Impact
(What is the impact of the risk) |
1 | |||
2 | |||
3 | |||
4 | |||
5 | |||
6 | |||
7 |
- By using the following matrix grids, evaluate the identified risks in ‘GM Holden 0 km Return Reduction’ project, [Marks 10]
Rating for likelihood and seriousness for each risk | |||
L | Rated as low | E | Rated as extreme (used for seriousness only) |
M | Rated as medium | NA | Not assessed |
H | Rated as high |
Grade: Combined effect of likelihood/seriousness | |||||
Seriousness | |||||
Likelihood | Low | Medium | High | Extreme | |
Low | E | D | C | A | |
Medium | D | C | B | A | |
High | C | B | A | A |
Answer
Ref: | Description of risk | Likelihood | Seriousness | Grade |
- As a project manager of ‘GM Holden 0 km Return Reduction’ project, develop and apply risk mitigation strategies and monitor their impact. [Marks 10]
(Use following strategies and their impact tables)
Recommended actions for grades of risk | |
Grade | Risk Actions |
A | Actions to reduce the likelihood and seriousness to be identified and implemented as soon as the project commences. |
B | Actions to reduce the likelihood and seriousness to be identified and appropriate actions implemented during project execution. |
C | Actions to reduce the likelihood and seriousness to be identified and costed for possible action if funds permit. |
D | To be noted – no action is needed unless grading increases over time. |
E | To be noted – no action is needed unless grading increases over time. |
Change to grade since last assessment | |||
NEW | New risk | ¯ | Grading decreased |
— | No change to grade | | Grading increased |
[Locker] The locker [id=8177] doesn't exist or the default lockers were deleted.
For Project Management Assignment Help or Management Assignment Help, visit www.makemyassignments.com.
Related Posts
Balancing multiple responsibilities is a hallmark of Japanese culture, with education and work often taking…
Picture this: a sun-soaked afternoon, your friends are gearing up for an epic game of…